[RESOLVED] Data Centre Power Maintenance Work 21/06/18

Thursday 21st June 2018 08:00 – 09:00

During the above window, Western Power Distribution will be conducting maintenance works to service the electricity substation supplying the area local to our data centre. During these works, the external mains power supplying our Data Centre will be disconnected for the safety of the engineers. In doing so the back-up electricity generators will supply the Data centre allowing for continued and uninterrupted service.

No down time is expected and all precautions will be taken to avoid any disruption, however during this window the Data centre should be considered at risk.