Blog Archives

Edge Network Router Reboot.

Our network supplier will be performing maintenance on the edge network router for a software upgrade, which includes a full reboot of the router between 20:00 and midnight. This may happen 2-3 times within the window, depending on the exact

Posted in Planned Maintenance

Planned Maintenance – Network core router from Data Centre

We will be switching our data centre network connectivity over to our backup network route between 17:00 – 18:00 on 24/01/2022. This work should not cause any downtime or reduction in performance but the web and email hosting network should

Posted in Planned Maintenance

Response to the Log4j vulnerability

We have been monitoring the ongoing situation regarding the recently discovered Log4j vulnerability, since the exploit was made public on 09/12/2021.Apache Log4j is a Java-based logging framework. On December 9, a remote code execution vulnerability was identified, which allows an

Posted in Vulnerabilities

Planned Maintenance – Swift28

We will be installing crucial system updates to swift28 early tomorrow morning (Tuesday 16th November). Maintenance window is expected to be between 6:30am and 8am.

Posted in Planned Maintenance, Servers, Windows

[RESOLVED] Some Fibre Leased Line circuits down

We are aware that some leased line circuits in the midlands and north of the country are currently down. A network issue is currently being investigated urgently and we will update shortly.

Posted in Network